A full exterior repaint covers the walls, the trim, the soffits and fascia, and the doors. This page is for the Eagle Mountain homeowner who wants to know what that means in practice before anyone comes to the door. The painting is done by the licensed contractor that Eagle Mountain House Painters, a referral service, matches you with, and everything below describes how the work usually goes and what you should check.
Step 1: Do your own walk-around
Before you ask for a match, walk the outside of the house with a notepad. A contractor will do the same walk and measure the paintable area, so your notes make the conversation shorter.
- What is the siding? Stucco, wood, fiber cement, vinyl or aluminum. The stucco page and the siding page treat them separately.
- How many stories? Height changes the price, as the cost page shows.
- Where is the paint failing? Look for peeling, chalk that rubs off on your hand, cracked caulk and bare wood.
- Which walls face the sun? Today's Homeowner says UV rays pose the greatest threat to a paint job, with prolonged exposure leading to fading (source).
- What else is included? Garage door, front door, soffits, fascia, fences, window trim.
- When was the house built? Before 1978 changes the rules. See the rules and approvals page.
Step 2: Read the quote line by line
A good written quote names the work. Pricing follows paintable area, siding material and height, so expect the contractor to measure. Compare scope, not only the total. The quote should say:
- What prep is included: washing, scraping, sanding, wood repair, caulking, spot priming.
- Which product line, how many coats and what sheen.
- How many colors.
- Who buys the paint.
- What the contractor does if weather stops work.
On sheen, Sherwin-Williams says satin or semi-gloss works best on trim and doors, while flat finishes can be used on large wall surfaces (source). It also recommends two coats for best results.
Step 3: Know what the prep includes
Sherwin-Williams says up to 80% of all coating failures can be directly attributed to inadequate surface preparation (source). Prep runs in this order, and the quote should say which steps are included:
- Wash the house. Pressure-washing or hand-washing removes dirt, mildew, chalk and loose paint. Sherwin-Williams says to allow at least 24 to 48 hours for the house to dry before painting.
- Scrape and sand. Loose paint is scraped and the edges are feathered. Glossy old paint is dulled so new paint can grip.
- Repair. Rotten trim and split boards are replaced or repaired. A painter is not a carpenter, so ask who does wood repair and how it is priced.
- Caulk. Old caulk that is cracking or pulling away should be dug out and replaced. Sherwin-Williams says to caulk butt joints but not the lap joints of siding, because those joints let moisture out from behind the wood (source).
- Prime. Sherwin-Williams says to apply an exterior primer on bare wood, brick or stucco to improve adhesion.
Step 4: How the painting itself goes
The usual sequence runs trim and doors first, then walls from the top down. Large walls are sprayed and then back-brushed or back-rolled, or rolled and brushed. Narrow lap siding is often brushed. Masking protects windows, light fixtures, roofing and plants, and drop cloths go over beds and walks.
In Eagle Mountain, ask how the crew handles wind. The city has described high winds that pushed tumbleweeds against homes (city notice, March 2024). A gusty day can blow dust onto wet paint and carry spray. The season and wind page covers the weather limits.
Step 5: Walk the finished job
At the end, walk the house with the contractor's crew lead. Mark misses, drips, thin spots and overspray before the crew leaves. Ask for leftover paint labeled with color and product, so touch-ups match later.
What can go wrong
Each of these has a cause you can ask about up front.
- Peeling. Moisture behind the paint, or paint over dirt, chalk or gloss.
- Streaks or staining. Cold nights and dew on fresh paint.
- Lap marks. Painting in direct sun.
- Cracked paint over caulk. The caulk was still wet.
- Blistering. Painting over damp wood or uncured stucco.
- Warped vinyl. A dark color on vinyl siding.
Questions to ask the contractor
- Is the company licensed in Utah, and under which classification? The state lookup shows any license.
- Is the house older than 1978, and if so, is the firm lead-safe certified?
- What exactly does prep include on this house?
- Which product, how many coats, what sheen on walls and on trim?
- What temperature and weather limits will the crew work within, and what happens if it rains?
- Who buys the paint, and do the leftover cans come back labeled?
- Do you need a copy of the homeowners association's written color approval before work starts?
- Is there a written warranty, and if so, what does it cover and for how long?
Common questions
Does the city need to approve a repaint?
The Eagle Mountain Building Department's permit handout lists painting as exempt from a building permit. For a given job, ask the department at 801-789-6614, since rules change. See the rules and approvals page for the source and the Building Department's contact.
How long will paint last?
Sherwin-Williams says exterior paint may last 7 to 10 years, depending on climate, surface material and paint quality (source).
Where these figures come from
Read in November 2026: Sherwin-Williams, Today's Homeowner and the City of Eagle Mountain. Ready to ask? The contact page explains how.