Weather at the wrong moment can spoil a paint job that was well prepared, which is why the limits below matter. This page is a checklist of Sherwin-Williams' published limits and of Eagle Mountain's setting. The contractor you are matched with through Eagle Mountain House Painters, a referral service, decides when work goes ahead, and the limits below are what to hold them to.
The limits, one by one
These figures are Sherwin-Williams' guidance, and the label on the can in use governs.
- Air temperature. Sherwin-Williams' general guidance is to avoid painting when temperatures are below 50°F or above 90°F (source).
- Low-temperature paints. Sherwin-Williams says its Duration, Resilience, SuperPaint and A-100 exterior paints can be applied down to 35°F, against a normal recommendation of 50°F for latex paint (source).
- The 48 hours after. The same FAQ says the temperature should ideally stay in the product's range and above the dew point for at least 48 hours after application, or the paint's life is shortened.
- Dew. Sherwin-Williams warns that dew forms as soon as the sun goes down and can get into uncured paint, causing surface staining and possible adhesion problems even when the daytime temperature was fine.
- Rain. Exterior paint typically needs at least 24 hours to fully cure before it is exposed to rain (source).
- After a storm. Sherwin-Williams advises waiting a minimum of one day after a heavy rain, and the surface must be dry before painting.
- After washing. Allow at least 24 to 48 hours for the house to dry before painting.
What this means for the calendar
Temperature and dew set the limits, not the month. What the limits tell you:
- Watch the overnight low, not only the afternoon high. In spring and fall the afternoon can be mild while the night falls into the dew and cold range. A job can start well and still be spoiled by the first evening.
- Summer afternoons. The city's Building Division design criteria use a summer design temperature of 98°F and a winter design temperature of 0°F (city PDF). Those are building-design numbers, not forecasts, so the week's forecast and the product label decide a working day.
- Winter. Exterior painting in the cold months is something to ask a contractor to justify, in writing, against the product label.
- Starting and stopping. A sound contractor starts walls once the morning dew is gone, follows the shade around the house, and quits early enough for the paint to set before sunset.
Eagle Mountain's setting
- Elevation and ground. Per Wikipedia, the city sits at 4,885 feet in the flat Cedar Valley, east and northeast of the town of Cedar Fort.
- Two climates in one city. The same entry says climate varies drastically between the northeastern Ranches area and the southwestern City Center area. A friend's report from the other side of town is not proof about your street.
- City Center. The City Center area near Fairfield lies in the Cedar Valley, which cuts it off from the moderating influence of the Salt Lake Valley.
- Wind. In March 2024 Eagle Mountain City described "the relentless high winds on Saturday" that piled hundreds of tumbleweeds against homes in certain neighborhoods. Ask the contractor what wind limit the crew works within for spraying or rolling.
What about the sun?
Today's Homeowner says UV rays pose the greatest threat to a paint job, with prolonged exposure leading to fading (source). Ask which product the contractor proposes for sun-facing walls and doors.
Wind checklist for the day of the job
- Ask what the crew does when gusts pick up: stop, switch from spraying to brushing, or reschedule.
- Ask how the contractor keeps blown dust and grit off wet paint.
- Clear tumbleweeds and loose debris from against the walls before work starts, or ask the contractor to.
- Ask who decides, you or the crew lead, when weather means stopping.
- Ask what happens to the schedule when it does.
Questions to ask about timing
- What temperature and weather limits do you work within, and what happens if it rains?
- Which product do you propose, and what is the minimum application temperature on its label?
- How do you protect fresh paint from dew in the evening?
- If a stretch of weather stops work, how will the homeowner hear about it?
Common questions
Can paint go on in the cold?
Only within the product's limits. Sherwin-Williams' general guidance is 50°F, and it says some of its lines go down to 35°F. Read the label and make the contractor read it with you.
Why does dew matter if the day was warm?
Dew forms after sunset and can get into paint that has not cured. Warm afternoons do not prevent that. The "Starting and stopping" note above covers how a crew plans around it, and the exterior repainting page lists the weather questions to ask before work starts.
Where these figures come from
Read in November 2026: Sherwin-Williams, the City of Eagle Mountain, Wikipedia and Today's Homeowner. To ask for a match, use the contact page.